Last updated: 20.10.2026 · Prepared by: Yusuf İnan Sezen, SMMM
Short answer: Two matters stand out when opening a business in Adalar: because of the conservation status, construction and changes of use depend on conservation board decisions, and the use of motor vehicles on the islands is restricted. For businesses that need to transport goods, the electric vehicle permit scheme announced by the municipality is examined separately. Tax and social security (SGK) matters vary with the activity.
Conservation status and plan situation
According to the Adalar page of the Istanbul Metropolitan Municipality (İBB) Urban Planning Directorate (Şehir Planlama Müdürlüğü), separate conservation-purpose zoning plans have been prepared for Büyükada, Heybeliada, Burgazada and Kınalıada; the district also falls within the Marmara Sea and Adalar Special Environmental Protection Area. The same page states that a stay of execution was ordered for the whole of the conservation-purpose 1/5000-scale master plan approved by the Ministry of Environment and Urbanization on 12.05.2023, and that work on a new plan began as a result; a court decision dated 15.10.2024 is also listed in the planning history section. In other words, the plan situation in the district is in flux; the current zoning status of an address is obtained from the competent authority at the time of application.
Article 9 of the Law on the Protection of Cultural and Natural Property No. 2863 (Kültür ve Tabiat Varlıklarını Koruma Kanunu) states that, contrary to the decisions taken by the regional conservation boards, no constructional or physical intervention may be made in immovable property requiring protection, conservation areas and protected sites, and that these may not be opened for reuse or have their use changed. The same article treats works such as substantial repair, construction, installation, drilling, full or partial demolition, burning, excavation or similar works as intervention. Within this framework, converting a building in Adalar into a restaurant, guesthouse or shop may depend on the change of use being consistent with board decisions.
The motor vehicle restriction and businesses
The text of the 2016 council decision of the Adalar Municipality (Adalar Belediyesi) states that the use of motor vehicles within the district boundaries is prohibited and that this prohibition is based on the decision of the Istanbul No. III Conservation Board for Cultural and Natural Property (İstanbul III Numaralı Kültür ve Tabiat Varlıklarını Koruma Kurulu) dated 16.09.1999. This restriction is a condition that affects how goods are brought to the island and how storage and distribution are arranged.
According to UKOME (Ulaşım Koordinasyon Merkezi, Transportation Coordination Centre) decision No. 2024/5-Ek.1 dated 25.07.2024, announced by the municipality, for an electric vehicle permit for freight transport, companies are required to have their centre of activity in the Adalar district, while other businesses, including tradesmen, are required to hold a valid business opening and operating licence. The permit is issued to at most two persons; these may be the business owner and an employee with an SGK record. The document is issued for one year, the renewal application is made each year to the Adalar District Police Directorate (Adalar İlçe Emniyet Müdürlüğü); the announcement states that the maximum speed on the islands is 20 kilometres per hour. Since the decision may change later, the current conditions are learned from the municipality and police units.
According to the announcement, exceeding the speed limit, using the vehicle outside the scope and purpose of the permit granted, using vehicles in pedestrian areas outside the hours specified in UKOME decisions, or parking in pedestrian areas leads to cancellation of the permit document, and the person whose permit is cancelled cannot reapply for one year.
Tax and SGK matters in seasonal tourism, retail and renovation work
Guesthouses, hotels and restaurants: Under Article 8 of Law No. 5510, the employer notifies the Institution of insured persons before the date their insurance coverage begins; in construction, fishing and agricultural workplaces the deadline is, at the latest, the day work is started. The article provides for an administrative fine under Article 102 for those who do not fulfil the notification obligation. In businesses whose activity level varies with the season, seasonal employees are also assessed within this scope. The scope of payment recording devices and POS is checked according to the activity; the invoicing of accommodation income and the VAT rate are determined by the type of service.
Grocery, greengrocer and food sales: For goods brought to the island, the reflection of the transport cost in the records, purchase invoices and shipping documents are among the matters checked. For a business transporting goods with an electric vehicle, the vehicle permit and the business licence can be followed in the same file. Food businesses also have record-keeping and inspection matters arising from food legislation.
Renovation, repair and construction work: In work that may be subject to conservation board decisions, the status of the permit document, the SGK notification if a subcontractor is employed, and the VAT treatment on progress payment invoices are among the matters checked. The arrangement for carrying materials may affect the duration and cost of the work because of the movement restrictions within the islands.
Company type in Adalar and points to watch
In a sole proprietorship, income tax and the person's liability with all their assets come to the fore; in capital companies, corporate tax and the partners' liability limited to their capital share come to the fore. This is an information list. Since the announcement includes conditions such as, for the freight permit in Adalar, companies having their centre of activity in Adalar and other businesses holding a valid business opening and operating licence, the documents underlying the permit are asked about from the relevant units.
Points to watch: the permit status of a renovation that may be subject to conservation board decisions, the consistency of a change of use with the plan and board decisions, the scope of the freight permit, and the equivalent in tax and SGK records of closing the business at the end of the season.
The general steps of company formation are explained on the company formation page, and the filing dates after starting business on the tax and social security calendar page. For a specific situation, consulting a professional is advisable.
Frequently asked questions
Is it possible to convert a building into a restaurant or guesthouse in Adalar?
A change of use may depend on conservation regional board decisions and compliance with the plan in force. Article 9 of Law No. 2863 prohibits physical intervention and change of use contrary to board decisions.
What is the current status of the zoning plan in Adalar?
According to the İBB Urban Planning page, a stay of execution was ordered for the 1/5000 plan approved on 12.05.2023, and work on a new plan has begun. The current status of an address is learned from the zoning status obtained from the competent authority.
Is it free to transport goods by motor vehicle in Adalar?
According to municipality records, the use of motor vehicles in the district is prohibited by a conservation board decision. There is a permit scheme for electric vehicles specified in a UKOME decision; its conditions are learned in their current form from the municipality and the police.
What conditions are required of the business for the freight permit?
According to the announcement of UKOME decision No. 2024/5-Ek.1, companies are required to have their centre of activity in the Adalar district, and other businesses are required to hold a valid business opening and operating licence; the permit is issued for one year and renewed each year by applying to the Adalar District Police Directorate.
When is the SGK notification made for seasonal employees?
Under Article 8 of Law No. 5510, insured persons are notified before the date their insurance coverage begins; in construction, fishing and agricultural workplaces, at the latest on the day work is started. An administrative fine is provided for those who do not fulfil the notification obligation; details are checked in the current SGK legislation.
Tax and social security steps when opening a business in Adalar
Alongside the workplace licence from the municipality, there are separate tax and social security steps. A company is applied for through MERSİS and registered with the trade registry; a sole proprietor files a notice of commencement with the tax office. The tax office competent for the workplace address then carries out an inspection; with the first employee the workplace is registered with the SGK, and e-Invoice and e-Ledger obligations depend on the activity. These steps follow the same legislation in every district of Istanbul, including Adalar.
- Company formation
- Limited company formation: step by step
- Accounting and bookkeeping
- Social security and payroll
- e-Invoice and e-Ledger
Sources
- İBB Şehir Planlama Müdürlüğü - Adalar İlçesi Strateji Belgesi ve Koruma Amaçlı Nazım İmar Planı: https://sehirplanlama.ibb.istanbul/adalarkanip/ (21.10.2026)
- 2863 sayılı Kültür ve Tabiat Varlıklarını Koruma Kanunu (Mevzuat Bilgi Sistemi): https://www.mevzuat.gov.tr/MevzuatMetin/1.5.2863.pdf (21.10.2026)
- Adalar Belediyesi - 2016 yılı meclis kararları: https://adalar.bel.tr/meclis-kararlari/2016-yili-1-ocak-31-aralik-tarihleri-arasinda-alinan-meclis-karari/ (21.10.2026)
- Adalar Belediyesi - 25.07.2024 tarih ve 2024/5-Ek.1 sayılı UKOME Kararı duyurusu: https://adalar.bel.tr/haberler/25-07-2024-tarih-ve-2024-5-ek-1-sayili-ukome-karari-geregince/ (21.10.2026)
- 5510 sayılı Sosyal Sigortalar ve Genel Sağlık Sigortası Kanunu (Mevzuat Bilgi Sistemi): https://www.mevzuat.gov.tr/MevzuatMetin/1.5.5510.pdf (21.10.2026)